Hydrostatic test on tanks during the section stage of a ship: the case study of the PSV 5000
In the modern shipbuilding, the construction and assembling of parts and block units are made far from the water, in specialized workshops / areas.In this way all the work is performed in a more efficient way, with the possibility of more accurate prediction of the delivery time and cost control.To move an activity in Mug an earlier stage, before t